| SL NO. | WORK DETAIL | CONTRACT AMOUNT | STATUS OF WORK |
|---|---|---|---|
| 1 | Construction of New-2 Lane road with paved shoulder from km 52/000 to 67/6000 km of NH-154 in the state of Assam under SARDP-NE (Phase-A), Job no. SARDP-NE/NH-154/AS/PWD/2009-10/141. | 627539972 | Completed |
| 2 | Construction of Lowairpoa Kanmun Road (Kj-M-7), Package No.ASRP/REH/NCB/12. | 559067350 | Completed |
| 3 | Construction of new 2-Lane road with paved shoulders to bypass Hailakandi Town between Km 18/800 to 26/000 of NH-154 in Assam under SARDP-NE. Phase-A. Job No. SARDP-NE/NH-154/AS/PWD/2012-13/208 | 425383924 | Completed |
| 4 | Improvement of Existing Single/ Intermediate lane of NH-154 to two lane with Paved Shoulder from km 3/500 to 10/000 & km 18/000 to 18/800 under SARDP-NE (Phase-A) Under Silchar NH Division. Job No. SARDP-NE / 154 / AS / PWD / 2008-09 / 065 | 339086921 | Completed |
| 5 | Re-construction /Widening to 2-Lane of NH-154 from Km 35/400 to 47/000 of existing Road (Actual Length 10.60 Km) including Paved Shoulder in the State of Assam under SARDP-NE, Phase-A. Job No.SARDP-NE/NH-154/AS/PWD/2008-09/93 | 282674235 | Completed |
| 6 | Strengthening to NH-44 (New NH-06) from Km 175.900 to km 180/00under A.P. 2016-17 under NH Division, Silchar. Job No. 06 (Old-44)/AS/2016-17/154. | 172991339 | Completed |
| 7 | Improvement of existing single / intermediate lane NH-154 to two lane with paved shoulders from km 10/0 to km 18/0 (Kapnarpar to Boalipar) under SARDP-/NE (Ph-A), Job no. SARDP-NE/NH-154/AS/PWD/2006-07/35 | 162838183 | Completed |
| 8 | Imp. Of existing single / intermediate lane of NH-154 to two lane with paved shoulder from km 26/000 to 35/400 (Bowerghat to Chandrapur) (Package No.-III) under SARDP-NE (Phase-A) Package no. BRD/BR/SARDP PH-A/2006-07/Sil/3, Job No. SARDP-NE/NH-154/AS/PWD/2006-07/29 | 161880876 | Completed |
| 9 | Construction of Road from 52.00 km Point of NH-154 Katlicherra Grant of District Hailakandi to Veterbond Dullavcherra NEC Road of District Karimganj under NLCPR | 161656721 | Completed |
| 10 | Improvement of Silchar to Samarikona Road (1) Portion from SMC point to Irongmara Ch. 4400.00 m to Ch. 19100.00 m and (2) Portion from Katapahar to Samarikona Point (Ch. 29875.25 m to 35900.00 m) under RIDF XIX of NABARD (Package No. Karimganj/ RIDF-XIX/27). | 100000000 | Completed |
| 11 | Protection of erosion from river Barak at Bagmara at Katakhal area under Hailakandi Water Respources Division against CM Special Package for Barak Valley for the year 2013-14. | 100000000 | Completed |
| 12 | Construction of Greater Bowerghat Multivillage PWSS under Hailakandi PHE Division | 89984000 | Completed |
| 13 | Rehabilitation of Hi-M-1 (Monacherra Ishancherra Road) & Hi-M-4 (Lala Gaglacherra Road) Package No. ASRP/REH/NCB/6) | 83697925 | Completed |
| 14 | Construction of Drain / Culvert & Block at Katlicherra Bazar (Balance Portion)(Ch. 1500.00 m 4085 m) including utility shifting of PHE pipe under Chief Minister’s Special Package for Barak Valley (Phase-II) for the year 2014-15 under Hailakandi Rural Road Division, Package No. HAL_CM’s_BV(PH-II)_18. | 77928666 | Completed |
| 15 | Construction of Rural Roads, Culverts and Minor Bridges and Routine maintenance of works for five years under PMGSY (Phase-VIII) for the year 2008-2009 ( Package No.: A S – 0 9 – 3 8) | 68635105 | Completed |
| 16 | Improvement of Silchar Hailakandi Road (Portion from Samarikona to Hailakandi) (Starting point of Municipalty) Ch.37200.00m to 44800.00m under the H/A 3054 (Non-Plan) for 2011-12, UNDER Karimganj state Road Division- PCKG No.-KSR/NP/11-12/1 | 66732703 | Completed |
| 17 | Construction of Rural Roads, Culverts & Minor Bridge & Routine Maintenance of the work for 5 years under PMGSY (ADB) Batch-II, 2007-08. (T5 to Algapur Part-V) Pkg. No. AS-09-18. | 62962579 | Completed |
| 18 | Construction of Rural Roads, Culverts & Minor Bridge & Routine Maintenance of the work for 5 years under PMGSY (Regular) Phase-VII, 2007-08. (02T6 to Ujankupa Pt-I, 02T5 to Safety Brojopur. Pkg. No. AS-09-28 | 51094477 | Completed |
| 19 | Improvement of Salachapra Bandukmara Road starting from Bhaterbazar under CM’s Spl. Package for Barak Valley during 2013-14 (Met. & BT from Ch. 17340.00 m)Package no. HAL_CMS_BV_55. | 49959764 | Completed |
| 20 | Construction of Saraspur Sonbil road under CM’s Spl. Package for Barak Valley during 2013-14, Package No. HAL_CMS_BV_57. | 49880119 | Completed |
| 21 | PR for the year 2013-14 from Km 26/000 to 35.400 km (Total = 9.4 km) on NH-154 under Karimganj NH Division in the State of Assam (Job No. TA-154-AS-2013-14-219) | 49468834 | Completed |
| 22 | Periodic Renewal for the year 2016-17 frpm KM 35/400 to km 46/000 km of NH-154 (Length = 10.600 km0 under Karimganj NH Division in the state of Assam, Job no. ARP(Phase-II)/AS/216-17/246/F | 48854007 | Completed |
| 23 | Construction of paved shoulder including drain cum footpath from km 30/0 to 41/0 to 51/500 to 67.0 of NH-154 (Job no. 0154-AS-2003-04-940). | 44995704 | Completed |
| 24 | Construction of Rural Roads, Culverts & Minor Bridge & Routine Maintenance of the work for 5 years under PMGSY (Regular) Phase-VII, 2007-08. (01T5 to Uttar Kanchanpur Part-I) Pkg. No. AS-09-22. | 44936640 | Completed |
| 25 | PR to NH-154 from Km 3/500 to Km 10/000 & Km 18/000 to Km 18/800 (Dhaleswari-Bhairabi Road) for the year 2015-16 under PWD Karimganj N.H. Division in the State of Assam. Job. No. TA-154-AS-2015-16-235 | 41724000 | Completed |
| 26 | Construction of Rural Roads, Culverts & Minor Bridge & Routine Maintenance of the work for 5 years under PMGSY (Regular) Phase-VII, 2007-08. (02T9 (Ujankupa Pt-II) to Ujankupa Pt-III, 01T4 at Algapur Pt-I to Bakrihower Pt-XII & 02T5 to Gangpar Dhumkar Pt-III. Pkg. No. AS-09-27 | 41591418 | Completed |
| 27 | Improvement of Anipur Jamung Road (Ch. 16.7 km to 23.8 km) under SOPD for 2018-19 under Karimganj Rural Road Division in Ratabari LAC (Package No. Ratabari/SOPD-G/2018-19/04) | 39748000 | Completed |
| 28 | Construction of Community Health Centre [Model Hospital] including residential quarters (Phase-I) at Chivitavichia in Hailakandi District. | 38737663 | Completed |
| 29 | Construction of Rural Roads, Culverts & Minor Bridge & Routine Maintenance of the work for 5 years under PMGSY (Regular) Phase-VII, 2007-08. (01T6 at Barnagad to Bashbari Pt-II (RL, Part-A), 01T6 at Barnagad to Bashbari Pt-II (RL, Part-B) Pkg. No. AS-09-23 | 38215636 | Completed |
| 30 | Construction and maintenance of Rural Roads and Cross Drainage Works from 01T5 to Chandipur Part-I under Pradhan Mantri Gram Sadak Yojana 2007-08 (Package No. AS-0920) | 37897593 | Completed |
| 31 | Construction of rural roads, culverts, minor bridges in Assam under PMGSY for the year 2003-04. (i) A Road from 29th Km of NH Road to 154 Lala Town, (ii) Harishnagar Part-I to Rangabak Part-II (From Rangabak side) including culverts, bridges etc. PMGSY for the year 2003-04 of Package No. AS-09-05. | 37340161 | Completed |
| 32 | Construction of Chief Judicial Magistrate Court Building at Hailakandi (4 storied RCC Building) | 35688549 | Completed |
| 33 | Periodic renewal to NH-154 for the year 2012-13 from km 10/00 to 18/00 and km 18/800 to 25/00 under Silchar NH Division in the state of Assam (Job No.TA-154-AS-2012-13-195) | 34501347 | Completed |
| 34 | Construction of Model School at different Districts under RMSA, Assam at Village Digar Srikona, P.O: Digor Srikona under Tapong Block in Cachar District, Assam (Group No.37) | 34390000 | Completed |
| 35 | Improvement of Anipur Jamung Road (Ch. 9.6 km to 16.7 Km) under SOPD for 2018-19 under Karimganj Rural Road Division in Ratabari LAC (Package No. Ratabari/SOPD/G/2018-19/03). | 34385000 | Completed |
| 36 | Construction of single lane RCC bridge over Karicherra khal including drain at Karicherra Bazar under Chief Minister ‘s special package for Barak Valley (Phase-II) for the year 2014-15. | 32491249 | Completed |
| 37 | Construction of RCC Bridge No. 46/1, 51/1 & 53/3 with approaches subways and protection works on Silchar-Dwarbond-Gaglacherra-Belaipur-Phaisen Road under NEC 10th five year plan programme, Package No. SB-10/24. | 31835323 | Completed |
| 38 | Construction of road from Kwarpar to Sahapur (Chibita Bichia-III to Chibita Bichia-I) (5.005 km) including cross drainage works and routine maintenance for 5 year under PMGSY (ADB), RCIP, Batch-II of 2013-14, Package no. AS-03-144, in Cachar District. | 30500746 | Completed |
| 39 | Improvement of connectivity of road from Satsanga Mandir to Police Point Old Hospital with side drain and retaining wall under CM’s Spl. Package for Barak Valley for the year 2013-14, Package No HAL_CMS_BV_30. | 29880012 | Completed |
| 40 | Construction and maintenance of Rural Roads and Cross Drainage Works from 01T4 to Bakrihower Pt-VI under Pradhan Mantri Gram Sadak Yojana 2007-08 (Package No. AS-0924) | 28515096 | Completed |
| 41 | (1)Construction of RCC Br. No.4/2 on Hailakandi Ratanpur Road under RIDF of NABARD. (2) Construction of RCC Br. No. 14/2 on Sunacherra to Kacharitol at Kacharitol under RIDF XVII of NABARD (Package No. HAIL/RIDF/21). | 28423176 | Completed |
| 42 | P.R. from km 0/000 to 2.500 km and km 18/800 to 25/000 (Length = 8.913 km) of NH-154 under Silchar NH Division in the state of Assam, Job No. 0154_AS_2008_09_079 | 26980000 | Completed |
| 43 | Upgradation & improvement of Silchar-Dwarbond-Gaglacherra-Phaisan Road under NEC’s 10th Five year Plan (Sponsored scheme from 45th km to 50th km) Package No. S-40 | 26032000 | Completed |
| 44 | Improvement of road from Latakandi to Sarbanandapur via Nutanbazar under CM’s Special Package for Barak Valley during 2013-14, Package No. HAL_CMS_BV_61. | 24954852 | Completed |
| 45 | Improvement of road from Old Hospital Point to Basic Chowrangee (Ch. 0.00 m to 2780.00 m) under Chief Ministers Special Package for Barak Valley (Phase-II) for the year 2014-15. | 22598000 | Completed |
| 46 | Upgradation & improvement of Silchar-Dwarbond-Gaglacherra-Phaisan Road under NEC’s 10th Five year Plan (Sponsored scheme from 41st km to 45th km) Package No. S-39. | 20933826 | Completed |
| 47 | Improvement of Silchar-Dwarbond-Gaglacherra-Belaipur Phaisen Road (40th km to 53rd Km) including protection to Box Culvert at Chainage 41.650 m and repairing of pot-holes and depressions (Length – 12 Km) under Chiefv Minister’s Special Package for Barak Valley during 2013-14. | 19989747 | Completed |
| 48 | Improvement of Serispur Bhairabnagar road (L=5.10 Km) under CM’s Spl. Package for Barak Valley during 2013-14, Package No. HAL_CMC_BV_59. | 19983882 | Completed |
| 49 | Improvement of PWD road starting from Lala Town to Sarbanandapur (GSB, WBM-III, Earth Work in Cutting, Earth work in Shoulder, BM and SDBC including interlocking Concrete Block Pavement ) under CM’s Special Package for Barak Valley during 2013-14, Package no. HAL_CMS_BV_63. | 19956350 | Completed |
| 50 | Construction of RCC Bridge No. 70/2 & 72/3 with approaches , subways and protection works on Silchar-Dwarbond-Gaglacherra-Belaipur-Phaisen Road under NEC 10th five year Plan programme, Package no. SB-10/45. | 19239294 | Completed |
| 51 | Construction of road from Bilaipur to Pratappur (Ch : 0.00 m to ch. 2000.00 m) under RIDF XX of NABARD (Package No.Hailakandi/RIDF/XX/27) | 18298907 | Completed |
| 52 | (1)Construction of RCC Br. No.2/3 on Chandpur Mukamtilla Road under untied SCA-2011-12. (2) Construction of RCC Br. No. 1/1 on Boldaboldi Paloisera Road under SCA-2011-12. (Package No. HAI-01) | 17349206 | Completed |
| 53 | PR to NH-53 (Silchar-Badarpur Section) from km 17.463 to Km 20.789 km for the year 2015-16 under PWD NH Division, Silchar in the state of Assam. (Job. No. TA-053-AS-2015-16-238). | 17075207 | Completed |
| 54 | Improvement of (i) Circuit House approach road & (ii) 21st km of NH-154 to Dhaleswari via Hilal Professor House under CM Special Package (Phase-II) for Barak Valley for the year 2015-16 under Hailakandi Rural Road Division | 16590591 | Completed |
| 55 | Construction of Girls Hostel at Srikona High School Campus under Tapong Block in Cachar District under RMSA, Assam (Group No.9) | 15340501 | Completed |
| 56 | Construction of Girls Hostel at Monipur (Aloicherra) Model School Campus under South Hailakandi Block in Hailakandi District under RMSA Assam (Group No.32) | 15306089 | Completed |
| 57 | Construction of Girls Hostel (100 Bedded) at Jamira High School under MSDP in Hailakandi District under Silchar Building Division | 15134504 | Completed |
| 58 | Construction of Road starting from Hailakandi Godamghat Road to Vichingcha Pt-II under Fakruddin Ali Ahmed Pakhi Path Nirman Achani under Development of Specific Roads for the year 2015-16 (L=1.90 Km) in Hailakandi LAC Package no.FAPNA-6) | 14960510 | Completed |
| 59 | Construction of Girls Hostel (100 Bedded) at Pranakrishna Girls H.S. School under MSDP in Hailakandi District under Silchar Building Division | 14275000 | Completed |
| 60 | Construction of Girls Hostel (100 Bedded) at Indrakumari H.S. School under MSDP in Hailakandi District under Silchar Building Division | 14250000 | Completed |
| 61 | Construuction of Station approach Road starting from Public School Point to Matijuri Railway Gate (Ch. 0.00 m to 555.00 m & ch. 558.00 m to 711.00 m) under Chief Ministers special package for Barak Valley (Ph-II) for the year 2014-15 under Hailakandi Rural Road Division . | 13326936 | Completed |
| 62 | Construction of road from 69th km of NH-154 to Uttar Paloicherra (L= 1.30 km) under MPNA Ph-III for the year 2013-14 (Package No. MPNA-III-HKD-07) | 11893949 | Completed |
| 63 | Construction of road from Chandipur TE to PMGSY road (L = 1.5 km) under MPNA PH-III for the year 2013-14 (Package No. MPNA-III-Hkd-08). | 11893662 | Completed |
| 64 | Construction of road from Namita Medical Point to Furmat Choudhury’s house (ch. 0.00 m to 830.00 m) under Chief Minister’s special package for Barak valley (Phase-II) for the year 2014-15 under Hailakandi Rural Road Division. | 11342385 | Completed |
| 65 | Construction of road from 01TS to Bakrihawor Pt-III, Length – 1.50 km (stretches from ch. 0.00 m ch. 1500.00 m) under Chief Minister’s special package for Barak Valley (Phase-II) for the year 2014-15 under Hailakandi Rural Road Division. | 9998177 | Completed |
| 66 | Construction of internal road of S.K. Roy civil hospital (100 Bedded Hospital) (Length = 0.8193 km) under Chief Minister’s Special Package for Barak valley (Phase-II) for the year 2014-15 under Hailakandi Rural Road Division. | 9996880 | Completed |
| 67 | Construction of Hailakandi Godamghat PWD Mt Bt road and Nazrul Sarani to Hailakandi Badarpur road via Dr. Ali’s House (Road starting from 1st km of Ratanpur road of NH-154 near SS College Marjid) under CM’s Spl. Packager for Barak Valley during 2013-14 | 9996522 | Completed |
| 68 | Construction of road starting from Tetoitol to Karimganj Border (ch. 0.00 to 1315.010 m) under Chief Minister’s special package for Barak Valley (Phase-II) for the year 2014-15 under Hailakandi Rural Road Division | 9996245 | Completed |
| 69 | S.O’s Office Building of PW (Building & N.H) Department at Patharkandi in Karimganj District under Silchar Building Division | 9015405 | Completed |
| 70 | PR to NH-154 from km 47/000 to km 52/000 (L=5.00 Km) under Silchar Nh Division during 2009-10 in the state of Assam | 8500000 | Completed |
| 71 | Special Repairs for rehabilitation of RCC Bridge no. 185/1 at Gumrah on NH-44 including construction of subway bridge and subway approach | 6671736 | Completed |
| 72 | PR for the year 2009-10 from km 35/000 to 39/900 km on NH-154 under Silchar NH Division in the State of Assam | 6200000 | Completed |
| 73 | SR to SPT Bridge No. 58/2 & 65/1 on Dhaleswari Bhairabi road of NH-154 under Silchar NH Division in the state of Assam. | 4812000 | Completed |
| 74 | Construction of High School and Higher Secondary School under Rastriya Madhyamik Siksha Abhijan for the year 2010-11 under Cachar / Karimganj District (Addl. Class Room, Science Laboratory, Library, Toilet Block & Drinking Water Facility at Kashipur V.P. School in Cachar district) 560/Package no.53. | 4702171 | Completed |
| 75 | Special repair to NH-44 for the year 2007-08 (Removal of damaged CC wearing coat and providing new asphaltic wearing coat on Barak Bridge at Badarpurghat )under Silchar NH Division | 4595000 | Completed |
| 76 | Repair of NH-44 from 201/000 km to 227/000 km ( L=26.00 km) and NH-151 from 0/000 km to 6/200km ( L=6.20 km) under silchar NH Division in the state of Assam, under Additional O.R for the year 2012-13, in connection with the proposed BCIM car rally.(portion from 0/000km to 2/000 km of NH-151, Group-I) | 4293698 | Completed |
| 77 | Estimate for L.A. & structures from km 35/0 to km 46/0 of Nh-154 under SARDP-NE, Ph-A in the state of Assam (Shifting & providing of underground water pipe line from km 35/0 to km 47/0 on NH-154 under SARDP-NE for the year 2007-08., Job. No. SARDP-NE/154/AS/PWD/2007-08/56 | 3598124 | Completed |
| 78 | Estimate for acquisition of land & structure utility shifting, boundary pillars, and preparation of DPR for Katlicherra by pass from km 47.00 to 52.00 of NH-154 under SARDP-NE, ph-A, in the state of Assam ( shifting of water supply lines) under Silchar NH Division Job No. SARDP-/154/AS/PWD/2009-10/136 | 2905294 | Completed |
| 79 | Construction of Jamira Rural Haat under AACP | 2565901 | Completed |
| 80 | Construction of High School and Higher Secondary School under Rastriya Madhyamik Siksha Abhijan for the year 2010-11 under Cachar / Karimganj District (Addl. Class Room, Science Laboratory, Library, Toilet Block & Drinking Water Facility at Hindi Vidyapith High School in Karimganj district) 560/Package no.67. | 2020504 | Completed |
| 81 | Final work order for stregthening of College Road, under 4th Finance Commission for the year 2011-12 (GSB, WBM overlaying by G-III including PC, Sc, earth work in shoulder etc.) | 1986516 | Completed |
| 82 | Final work order for stregthening/ Repairing of existing surface of S.S. Sarani, under 4th Finance Commission for the year 2011-12 (providing GSB, WBM overlaying by G-III including PC, Sc, earth work in shoulder etc.) | 1893077 | Completed |
| 83 | Final work order for stregthening of Srinath Road, under 4th Finance Commission for the year 2011-12 (GSB, WBM overlaying by G-III including PC, Sc, earth work in shoulder etc.) | 1893077 | Completed |
| 84 | Construction of High School and Higher Secondary School under Rastriya Madhyamik Siksha Abhijan for the year 2010-11 under Cachar / Karimganj District (Addl. Class Room, Library, Toilet Block at Bam Vidyapith High School in Cachar district) 560/Package no.3. | 1890965 | Completed |
| 85 | Construction of High School and Higher Secondary School under Rastriya Madhyamik Siksha Abhijan for the year 2010-11 under Cachar / Karimganj District (Computer Lab. & Library at Model H.S. School in Karimganj district) 560/Package no.57. | 1807015 | Completed |
| 86 | SR to SPT Bridge No. 55/1 on Dhaleswari Bhairabi road of NH-154 under Silchar NH Division in the state of Assam, Job No. TA-0154-As-2008-09/087 | 1724000 | Completed |
| 87 | Construction of High School and Higher Secondary School under Rastriya Madhyamik Siksha Abhijan for the year 2010-11 under Cachar / Karimganj District (Addl. Class Room, Science Laboratory, & Computer Laboratory at Bhikamchand Balika Vidya Niketan H.S. School in Karimganj district) 560/Package no.56. | 1619955 | Completed |
| 88 | Final work order for stregthening of B.T. Road, under 4th Finance Commission for the year 2011-12 (GSB, WBM overlaying by G-III including PC, Sc, earth work in shoulder etc.) | 1426184 | Completed |
| 89 | Final work order for stregthening/ Repairing of Thangle Road (part-II), under 4th Finance Commission for the year 2011-12 (GSB, WBM overlaying by G-III including PC, Sc, earth work in shoulder etc.) | 1016195 | Completed |
| 90 | Final work order for stregthening/ construction of G.P Sarani, W/No. 4 & 5 under 4th Finance Commission for the year 2011-12 (GSB, WBM overlaying by G-III including PC, Sc, earth work in shoulder etc.) | 813150 | Completed |
| 91 | Final work order for stregthening/ Repairing of Sahid Nanda Road, under 4th Finance Commission for the year 2011-12 (GSB, WBM overlaying by G-III including PC, Sc, earth work in shoulder etc.) | 708130 | Completed |
| 92 | Final work order for stregthening of Mahaprabhu Sarani, W/No. 4 under 4th Finance Commission for the year 2011-12 (GSB, WBM overlaying by G-III including PC, Sc, earth work in shoulder etc.) | 631151 | Completed |
| 93 | Final work order for stregthening of Durga Ram Lane, under 4th Finance Commission for the year 2011-12 (GSB, WBM overlaying by G-III including PC, Sc, earth work in shoulder etc.) | 383596 | Completed |
| 94 | Final work order for stregthening/ Repairing of Badalmal Sarani, under 4th Finance Commission for the year 2011-12 (GSB, WBM overlaying by G-III including PC, Sc, earth work in shoulder etc.) | 300679 | Completed |
| 95 | Final work order for stregthening of Mokbul Hussain Lane under 4th Finance Commission for the year 2011-12 (GSB, WBM overlaying by G-III including PC, Sc, earth work in shoulder etc.) | 290224 | Completed |
| 96 | Strengthening & widening of NH-44 from Km 173/125 to 175/900 , km 191/00 to km km 197/00 , km 197/00 to 206/500 of NH-44 (Length = 18.275 km) in EPC Mode under PWD Silchar NH Division in the State of Assam. | 406817257 | Completed |
| 97 | Const. of New 2-Lane Road with Paved Shoulders from Km.47/00 to Km. 52/00 of NH-154 under Phase-A of SARDP-NE in the staste of Assam | 154588701 | Completed |
| 98 | Strengthening profile correction and re-desiging of Pavement on NH-102B from km 25/50 to km 37/10 (Saichal to Hliappui) and from km 46/10 to km 76/10 (Pawlrang to Ngopa) in the State of Mizoram (Job No. 102B/MZ/2017-18/113). | 109831104 | Completed |
| 99 | Repair & maintenance to NH-53 (Silchar Badarpur Section) from km 10.40 to km 30.262 under SOPD 2019-20 (Repair of damaged pavement by WMM, BM, BC including earth work in shoulder from km 10.40 to 30th km including construction of road side drain etc. in stretches) under PWD, NH Division , Silchar in the State of Assam, Package No. BRD/RD/SIL(SOPD)/ 2019- 20/12. | 40008231 | Completed |
| 100 | Repair & Maintenance to NH-53 (Silchar-Badarpur section) under SOPD 2018-19 (Repairing of damaged pavement by providing WMM, BM & BC including earth work in shoulder at 4th km to 7th km, 12th Km to 27th km and 29th km to 30th km (in strethes) under PWD Silchar NH Division in the state of Assam, Package NO. PWD-BRD(RD)/SIL/SOPD/2018-19/010 | 22926900 | Completed |
| 101 | T04 to Kalidas Punjee including CD works and routine maintenance for 5 years under Hailakandi District Package No. (AS-09-050) | 3775630 | Completed |
| 102 | Repair & maintenance to NH-54 (Silchar Lailapur section) under SOPD 2018-19 (Repairing of damaged pavement by providing BM & BC at 17th km, 21st km, 23rd km, 26th km and 30th km (in stretches) under PWD Silchar NH Division in the State of Assam (Excluding km 17th, 23rd & 26th) Package no. PWD-BRD(RD)/SIL/SOPD/2018-19/08(RT). | 14999944 | Completed |
| 103 | Improvement of Algapur Mohanpur road from Ch. 2300.00 m to 5500.00 m under SOPD-G for the year 2018-19 for Karimganj State Road Division, Package No. SE/KSRD/02/SOPD-G/2018-19. | 717025555 | Completed |
| 104 | Consruction of 2 Lane Patherkandi Bypass with Paved Shoulders (Total Length = 9.224 km) in Karimganj NH Division in Assam on EPC Mode. | 83588761 | Completed |
| 105 | Strengthening to NH-53 (Silchar Badarpur section) from km 3.65 to km 6.25 and NH-54 at 21st km, 27th km to 30th km, 35th km, 36TH Km and 40th km in stretches for 2019-20 on EPC mode under PWD, NH Division Silchar in the State of Assam. Job no. 053/054/AS/2019-20/189 | 43336945 | Completed |
| 106 | Repair and maintenance to NH-54 (Silchar Lailapur section) under SOPD for the year 2019-20 (Repair of damaged pavement by providing BM and BC at 1st km, 2nd km , 9th Km to 11th km and 41st km including providing interlocking CC Paver block at side berm , construction of road side RCC drain along with road furnitures in stretches ) under PWD NH Division, Silchar in the state of Assam, Package no. BRD/RD/SIL(SOPD)/2019-20/10 | 199770547 | Completed |
| 107 | Strengthening and reconstruction including raising of isolated stretches of the existing road as well as providing road safety measures, RCC covered drain etc. at Asimganj and Patherkandi Town area from 252/528 km to 259/525 km of NH-44 (Total Length = 6.997) under SOPD for the year 2020-21 under Karimganj NH Division in the state of Assam. | 93184649 | Completed |
| 108 | Providing road safety device & road furniture from km 173.325 to km 180.00 & km 191.00 to k 206.50, Repair & Maintenance to stretches from km 175.90 to km 180.00 and providing CC Block hard shoulder at Katigorah from 198.874 to km 200.400 & Badarpur from 201.610 km to 204.540 on NH-44 under SOPD for the year 2019-20 under PWD NH Division Silchar in the State of Assam. Package No. BRD/RD/SIL(SOPD)/2019-20/18. | 60436800 | Completed |
| 109 | Construction of RCC Br. No. 18/2, 19/1 & 22/3 on Salchapra Bandukmara Road including approaches & Protection works for Conversion to RCC Bridges under Mahabir Lachit Chilarai Setu Nirman Abhijan under RIDF XXIV of NABARD for the year 2018-19, Package No. MLCSNA/Hailakandi/01 | 47684700 | Completed |
| 110 | Construction of road from (1) 05T2 to Sultanicherra Grant R.V. (ii) 05T2 to Nandagram N.C and (iii) 05T2 to Boldaboldi Punji Pt-III including CD Routine & maintenance of the Works for 5 years under PMGSY, Package No. AS-09-043 (Balance Work) | 31099966 | Completed |
| 111 | Construction of Anipur Zamung Road from Rongpur to Assam Mizoram Border under SOPD-G for the year 2018-19 under Karimganj Roral Road Division (Package No. BV/SOPD-G/2018-19/KXJ/ACE/02. | 21722000 | Completed |
| 112 | Construction of Road from T05 Garuncherra Punjee to Dinonathpur Pt-I including cross drainage works and routine maintenance of the works for five years under PMGSY Package No.AS-09-066. | 20,865,080 | Completed |
| 113 | Construction of Model High School for Tea Garden Areas in Assam at (i) Lakhinagar T.E & (ii) Koya T.E. in Hailakandi District, Category-II, Group No. TG-7. | 297260047 | Completed |
| 114 | Balance work of Silchar Bypass from Km 0.00 to Km 12.750 (ISBT to Sonabarighat) under SOPD for the year 2020-21 under Silchar NH Division in the State of Assam. Package No. BRD/RD/SIL(SOPD)/2020-21/03. | 160080403 | Completed |
| 115 | Repair and maintenance to NH-53 (Silchar Jiribam Section) under SOPD for the year 2019-20 (Repairing of damaged pavement by providing WMM, BM and BC including earth work in shoulder, road side drain, intelocking paver block at side berm in stretches from 9th km to 30th km and construction of a HP culvert at 10th km along with road furnitures) under PWD, NH Division, Silchar in the State of Assam. Package No. BRD/RD/SIL/(SOPD)/2019-20/11. | 25209424.05 | Completed |
| 116 | Repair & Restoration NH-53 (Old) / NH-37 (New) Silchar-Badarpur Section in FY 22-23. | 70309675 | Completed |
| 117 | Construction of RCC Bridge No. 1/1 at Cheragi Bazar over River Singhala for conversion of SPT Bridges to RCC Bridges under Mahabir Lachit Chilarai Setu Nirman Abhijan of RIDF-XXV of NABARD for 2019-20 , Package No. MLCSNA/RIDF/XXV/Karimganj/04 | 1275700000 | Completed |
| 118 | "Improvement of existing single / Intermediate lane of NH-44 to 2 lane with paved shoulder from Km 230/200 to Km 247/000, Km 261/504 (Ex. Ch.-260/109) to Km 263/191 (Ex. Ch.261/761) and Km 272/241 (Ex. Ch. 271/000) to Km 284/033 (Ex. Ch. 284/053) (Total Length=30.28Km) under SARDP-NE (Phase-A) in the State of Assam (Job No.-SARDP-NE/NH-44/AS/PWD/2010-11/182)" | 112571512.5 | Completed |
| 119 | Repair & Restoration - NH-44 (OLD)/NH-06(NEW) from Km 173.325 to Km 175.900, Km 178.130 to Km 178.500, Km 191.000 to Km 201.440 (Malidor-Badarpurghat in Stretches) & NH-44 (Old/NH-37) (New) Km 201.440 to Km 206.500 (Badarpurghat Srigouri) (At selected locations ) in FY 22-23. | 36757800 | Completed |
| 120 | Construction of approaches & protection works for Bridge No. 7/4 over River Barak at Badrighat (Barenga) on Silchar Fulertal road under SOPD-G for the year 2021-22, Package No. SOPD_G_21_22_23. | 54649198 | Completed |
| 121 | Upgradation of Roads from MRL04-Matijuri to Chepti Brojopur road including cross drainage works and routine maintenance of the works for five years under Package No. AS-09-091.PMGSY-III, Batch-1, 2022-23. | 30698598 | Completed |
| 122 | Up-gradation of SC/SD/PHC to Community Health Centre (Phase-l) in Barak valley under CMs Spl. Pekage at Kalinagar PHC in Hailakandi District under Annual Plan 2013-14. Package no.CHC-12. | 12143320 | Completed |
| 123 | Construction of Circle Office Building including Civil , Electricals works and brick boundary walls with RCC posts in respect of Circle Officer, Lala revenue Circle under Hailakandi Distrct. | 1,30,51,350 | Completed |
| 124 | Construction of Circle Office Building including Civil , Sanitary, Water supply, Electrification, brick boundary wall with Iron Gate and pucca approach in respect of Circle Officer, Algapur revenue Circle under Hailakandi Distrct. | 451283148 | Completed |
| 125 | Const. of New 2-Lane Road with Paved Shoulders from Km.0/00 to Km. 3/500 of NH-154 under Phase-A of SARDP-NE in the staste of Assam. Job No. SARDP-NE / 154 / AS / PWD /2011-12/187 | 79790000 | Completed |
| 126 | Establishment of 21 nos New Polytechnics in different district of Assam under Plan during 2011-12 at Katlicherra in Hailakandi district (Package : Poly-8) | 36146800 | Completed |
| 127 | Construction of proposed ITI Building at Kuchila under MSDP in Hailakandi District under Silchar Building Division | 27871091 | Completed |
| 128 | Market modernization and improvement program (MMIP) of Sonai General Market in Cachar District under APART (Package No.APART/NOCP/MARKETS/C-04). | 25689337 | Completed |
| 129 | Improvement of NH-154 fro km 0/000 (existing) to km 2/985 (existing) (Length = 2.985 km) with GSB, WMM, DBM & BC along with surface drain and ICBP in streches under SOPD for the year 2019-20 (from Ch. 0.00 km to Ch. 2/985 km) Package no. BRD/RD/KXJ(SOPD)/2019-20/15. | 145026209 | Completed |
| 130 | Construction of paved shoulder with Interlocking Concrete Paver Block (ICBP) at Built-up areas in stretches including construction / reconstruction of RCC covered drain in stretches and immediate repair of Damaged stretches including cutting of Katcha Drain at Asimganj and Patherkandi Town area from km 252/528 to Km to Km 259/525 of NH-44, construction of Traffic Rotary at intersection of Patherkandi Bypass & Asimganj-Anipur MDR road and additional road safety & road furniture work at Patherkandi bypass in the district of Karimganj under SOPD 2020-21, Package no. BRD/RD/KXJ(SOPD)/2020-21/06. | 41126100 | Completed |
| 131 | Repair and maintenance of NH-54 (Silchar-Lailapur section) from km 2.00 to km 8.876 under SOPD for 2021-22 (Providing BM inprofile correction and pot hole repair in stretches, 30 mm including earth work in shoulder in stretches) under PWD, Silchar NH Division. (Package No. BRD/RD/SIL/(SOPD)/2021-22/07. | 2163302310 | Completed |
| 132 | 2 Laning with earthen shoulders from Ranikor (Khadpra) to Nongri existing chainage from Ch. 0.000 to 31.700 (Design Length = 33.250 Km) in the State of Meghalaya on EPC Mode under SARDP-NE. | 311622072 | Completed |
| 133 | Construction of road from T04-Haflong to Jorai Michiborochenam via Chaikam including CD works and Routine maintenance for five years, Package number (AS-18-048) under PMGSY (Regular) 2018-19, Batch-I in N.C. Hills District. | 110117138 | Completed |
| 134 | Construction of road from L032-Old Kubin to Mongon including CD works and Routine maintenance for five years, Package number AS-18-044 under PMGSY (Regular) 2018-19, Batch-I in N.C. Hills District. | 229173200 | Completed |
| 135 | Repair and restoration of (i) Ch. 206.500 km to Km 223.000, Ch. 247.000 km to 252.280 km , Ch. 261.761 km to 271.000 km on NH44 (Old) / NH-8 (New) & Karimganj Bypass Ch.0.000 km to 3.500 km ; (b) Patherkandi Bypass Ch. 252.280 km to 261.504 km on NH-44 (old) / NH-8 (New) (at selected locations) in FY 2023-24 | 49932271 | Completed |
| 136 | Strengtheing & improvement of (i) Silchar Hailakandi road, (ii) road from Old Hospital point to Bypass, (iii) Hailakandi Ratanpur road, (iv) road from Lakhirbond to Bowerghat, (v) Circuit House road, (vi) road from Bata Point to Kalibari Point (SS Road), (vii) Vivekananda road, (viii) Station road in Hailakandi district for ensuing Durga Puja 2023 under SOPD-G for the year 2023-24, Hailakandi LAC, Package no. SOPD_G_23_24_24. | 38598876 | Completed |
| 137 | Strengthening and improvement of Church road & Subhas Nagar road, (b) Strengtheing and improvement of road starts from Normal School point to Silchar Central School via Tarapur Girls High School, T.V. Centre, (c) Strenthening and improvement of road fromPremtola point to Assam Rifles in Silchar town, (d) Strengthening and improvement of road from Cachar College to Itkhola Point in Silchar Town, (e) Urgent repairing of bridge no. 1/1 (Sadarghat Bridge) over Barak River on Silchar Kumbhirgram road for easy movement of vehicular traffic and convenience of large number of crowd and devotees in Silchar Town during the ensuing Durga Puja, 2023 for the year 2023-24, Silchar LAC, Package no. SOPD_G_23_24_22. | 252425000 | Completed |
| 138 | widening of existing intermediate lane to 2L+PS from 224th km of NH44 to 1st km of NH-151 (Missing link) (Length = 4.00 Km) under Annual Plan 2022-23 in the State of Assam (Job no.151/AS/2022-23/242). | 9724133 | Completed |
| 139 | Implementation of Retrofitting works in SAKALARPAR Piped Water Supply Scheme within the jurisdiction of Hailakandi Division under Jal Jeevan Mission, Assam. | 9114000 | Completed |
| 140 | Implementation of Retrofitting works in GOUR BASTI Piped Water Supply Scheme within the jurisdiction of Hailakandi Division under Jal Jeevan Mission, Assam. | 102768000 | Completed |
| 141 | Implementation of different Pipe Water Supply Schemes under Hailakandi Division for retrofitting under the programme Jal Jeevan Mission Assam. (Package.04) | 9398321 | Completed |
| 142 | Implementation of retrofitting Aloicherra Pipe Water Supply Scheme within the jurisdiction of Hailakandi Division under Jal Jeevan Mission, Assam". | 4599831 | Completed |
| 143 | Repair and maintenance to NH-53 (Silchar Badarpur Section) from Km 1.720 to km 2.502 under SOPD for the year 2021-22 (Providing BM in profile correction and pot repair in stretches and 30 mm thick BC overlaying) under PWD, NH Division,Silchar. | 1485000 | Completed |
| 144 | Implementation of Sakalarpar Piped Water Supply Scheme under Hailakandi PHE Division for retrofitting under the programme Jal Jeevan Mission Assam.(Revised) | 314000 | Completed |
| 145 | Implementation of South Dinanathpur Piped Water Supply Scheme under Hailakandi PHE Division for retrofitting under the programme Jal Jeevan Mission Assam.(Revised) | 306000 | Completed |
| 146 | Implementation of Dholai Molai- IV/V Piped Water Supply Scheme under Hailakandi PHE Division for retrofitting under the programme Jal Jeevan Mission Assam.(Revised) | 3078000 | Completed |
| 147 | Implementation of Uttar Dariarghat Piped Water Supply Scheme under Hailakandi PHE Division for retrofitting under the programme Jal Jeevan Mission Assam.(Revised) | 3257000 | Completed |
| 148 | Implementation of Dinanathpur Piped Water Supply Scheme under Hailakandi PHE Division for retrofitting under the programme Jal Jeevan Mission Assam.(Revised) | 3078000 | Completed |
| 149 | Implementation of Dhariarghat Piped Water Supply Scheme under Hailakandi PHE Division for retrofitting under the programme Jal Jeevan Mission Assam.(Revised) | 872000 | Completed |
| 150 | Implementation of Tillagaon Billgaon Piped Water Supply Scheme under Hailakandi PHE Division for retrofitting under the programme Jal Jeevan Mission Assam.(Revised) | 9829161 | Completed |
| 151 | Strengthening of Badri Bridge approach at Barenga Kashipur road under SOPD-G for the year 2023-24, Silchar LAC, Package No. SOPD_G_23_24_25. | 27147014 | Completed |
| 152 | Replacement of Tarapur ROB railings and conversion of CC block surface to black-top including repair of different BT surface roads within Silchar Town before forthcoming Durga Puja 2023 under SOPD 2023-24 under PWD NH Division, Silchar, Packahge No. PWD RD(Roads)/SIL/SOPD/2023-24/03. | 8560000 | Completed |
| 153 | Implementation of 4th SLSSC fresh scheme 2022-23 Thori Basti consisting of 1 no. Piped Water Supply Scheme of Silchar (PHE) Division no.-II under the programme Jal Jeevan Mission Assam | 5701000 | Completed |
| 154 | Implementation of 4th SLSSC fresh scheme 2022-23 Sangam Sumbi WSS of Silchar-II Division under the programme Jal Jeevan Mission Assam | 3458000 | Completed |
| 155 | Implementation of New Piped Water Supply Schemes of U/s Chiru Punjee WSS Silchar-II Division under the programme Jal Jeevan Mission Assam | 8522000 | Completed |
| 156 | Implementation of New Piped Water Supply Schemes of U/s Hmar Tilla WSS Silchar-II Division under the programme Jal Jeevan Mission Assam | 8056000 | Completed |
| 157 | Implementation of New Piped Water Supply Schemes of Hatikuri 7 no. WSS Silchar-II Division under the programme Jal Jeevan Mission Assam | 7353000 | Completed |
| 158 | Implementation of New Piped Water Supply Schemes of Bariknagar-I WSS (4th SLSSC) of Silchar-II Division under the programme Jal Jeevan Mission Assam | 7401000 | Completed |
| 159 | Implementation of New Piped Water Supply Schemes of Nath Basti WSS Silchar-II Division under the programme Jal Jeevan Mission Assam | 177700000 | Completed |
| 160 | Implementation of different Pipe Water Supply Schemes under Silchar-I for retrofitting under the Programme Jal Jeevan Mission Assam". | 69674000 | Completed |
| 161 | Implementation of different Pipe Water Supply Schemes under Silchar-II for retrofitting under the Programme Jal Jeevan Mission Assam". | 42700000 | Completed |
| 162 | Implementation of different Pipe Water Supply Schemes under Silchar Division-I for retrofitting under the programme Jal Jeevan Mission Assam. | 3358583 | Completed |
| 163 | Implementation of revised retrofitting of Chirukandi Piped Water Supply Scheme within the jurisdiction of Silchar Division No.I under the programme Jal Jeevan Mission Assam. | 4565000 | Completed |
| 164 | Implementation of revised retrofitting of Niz-Joynagar Piped Water Supply Scheme within the jurisdiction of Silchar Division No.I under the programme Jal Jeevan Mission Assam. | 8221000 | Completed |
| 165 | Implementation of revised retrofitting of Kumarpara Piped Water Supply Scheme within the jurisdiction of Silchar Division No.I under the programme Jal Jeevan Mission Assam. | 841700 | Completed |
| 166 | Implementation of revised retrofitting of Algapur Piped Water Supply Scheme within the jurisdiction of Silchar Division No.I under the programme Jal Jeevan Mission Assam. | 3230000 | Completed |
| 167 | Implementation of revised retrofitting of Manikpur Piped Water Supply Scheme within the jurisdiction of Silchar Division No.I under the programme Jal Jeevan Mission Assam. | 4902000 | Completed |
| 168 | Implementation of revised retrofitting of Bhangarpar Piped Water Supply Scheme within the jurisdiction of Silchar Division No.I under the programme Jal Jeevan Mission Assam. | 7990000 | Completed |
| 169 | Implementation of revised retrofitting of Bhangarpar Pt-I Piped Water Supply Scheme within the jurisdiction of Silchar Division No.I under the programme Jal Jeevan Mission Assam. | 5529000 | Completed |
| 170 | Implementation of revised retrofitting of Srikona Piped Water Supply Scheme within the jurisdiction of Silchar Division No.I under the programme Jal Jeevan Mission Assam. | 5444000 | Completed |
| 171 | Implementation of revised retrofitting of Srikona Pt-II Piped Water Supply Scheme within the jurisdiction of Silchar Division No.I under the programme Jal Jeevan Mission Assam. | 5615000 | Completed |
| 172 | Implementation of revised retrofitting of Srikona Pt-I Piped Water Supply Scheme within the jurisdiction of Silchar Division No.I under the programme Jal Jeevan Mission Assam. | 3704468.57 | Completed |
| 173 | FDR to NH-44 for the year 2020-21 in the district of Karimganj in the state of Assam (Immediate Repair of damaged stretches of NH-44 from Km 230/200 to Km 240/000 with GSB, WBM-III & BC in stretches) under Karimganj NH Division. (From Km 230/000 to 237/000) (Gr-I). | 3912480.95 | Completed |
| 174 | FDR to NH-44 for the year 2020-21 in the district of Karimganj in the state of Assam (Immediate Repair of damaged stretches of NH-44 from Km 230/200 to Km 240/000 with GSB, WBM-III & BC in stretches) under Karimganj NH Division. (From Km 237/200 to 239/700)(Gr-II) | 2941802.74 | Completed |
| 175 | FDR to NH-44 for the year 2020-21 in the district of Karimganj in the state of Assam (Immediate Repair of damaged stretches of NH-44 from Km 240/000 to Km 247/000 with GSB, WBM-III & BC in stretches) under Karimganj NH Division. (From Km 243/680 to 247/000)(Gr-IV) | 1390433.87 | Completed |
| 176 | FDR to NH-44 for the year 2020-21 in the district of Karimganj in the state of Assam (Immediate Repair of damaged stretches of NH-44 from Km 240/000 to Km 247/000 with GSB, WBM-III & BC in stretches) under Karimganj NH Division. (From Km 242/800 to 243/680)(Gr-V) | 4167819 | Completed |
| 177 | FDR to NH-44 for the year 2020-21 in the district of Karimganj in the state of Assam (Immediate Repair of damaged stretches of NH-44 from Km 240/000 to Km 247/000 with GSB, WBM-III & BC in stretches) under Karimganj NH Division. (From Km 240/000 to 242/800)(Gr-V) | Completed |