2 Laning with earthen shoulders from Ranikor (Khadpra) to Nongri existing chainage from Ch. 0.000 to 31.700 (Design Length = 33.250 Km) in the State of Meghalaya on EPC Mode under SARDP-NE. | LOA No. NHIDCL/Megh/R-M-B/Ph-1/Package-1 (R-N)/2018/Vol.I/ | 09.03.2019 | 2163302310 | |
"Improvement of existing single / Intermediate lane of NH-44 to 2 lane with paved shoulder from Km 230/200 to Km 247/000, Km 261/504 (Ex. Ch.-260/109) to Km 263/191 (Ex. Ch.261/761) and Km 272/241 (Ex. Ch. 271/000) to Km 284/033 (Ex. Ch. 284/053) (Total Length=30.28Km) under SARDP-NE (Phase-A) in the State of Assam (Job No.-SARDP-NE/NH-44/AS/PWD/2010-11/182)" | BRD/RD/52/2016/Pt-I/26 | 26.11.2020 | 1275700000 | New |
Consruction of 2 Lane Patherkandi Bypass with Paved Shoulders (Total Length = 9.224 km) in Karimganj NH Division in Assam on EPC Mode. | LOA No. NH-12014/40/2014/AS/NH-8 | 03.08.2015 | 717025555 | |
Const. of New 2-Lane Road with Paved Shoulders from Km.0/00 to Km. 3/500 of NH-154 under Phase-A of SARDP-NE in the staste of Assam. Job No. SARDP-NE / 154 / AS / PWD /2011-12/187 | BRD/RD/31/06/Pt/.. | 30.10. 2011 | 451283148 | |
Construction of road from T04-Haflong to Jorai Michiborochenam via Chaikam including CD works and Routine maintenance for five years, Package number (AS-18-048) under PMGSY (Regular) 2018-19, Batch-I in N.C. Hills District. | CE/Commn/PMGSY/14/2019-20/5 | 07.09.2019 | 311622072 | |
Repair and maintenance to NH-53 (Silchar Jiribam Section) under SOPD for the year 2019-20 (Repairing of damaged pavement by providing WMM, BM and BC including earth work in shoulder, road side drain, intelocking paver block at side berm in stretches from 9th km to 30th km and construction of a HP culvert at 10th km along with road furnitures) under PWD, NH Division, Silchar in the State of Assam. Package No. BRD/RD/SIL/(SOPD)/2019-20/11. | LOA No.BRD/RD/84/2019/Pt/12 | 13.03.2020 | 160080403 | |
Construction of road from L032-Old Kubin to Mongon including CD works and Routine maintenance for five years, Package number AS-18-044 under PMGSY (Regular) 2018-19, Batch-I in N.C. Hills District. | CE/Commn/PMGSY/13/2019-20/5 | 07.09.2019 | 110117138 | |
Providing road safety device & road furniture from km 173.325 to km 180.00 & km 191.00 to k 206.50, Repair & Maintenance to stretches from km 175.90 to km 180.00 and providing CC Block hard shoulder at Katigorah from 198.874 to km 200.400 & Badarpur from 201.610 km to 204.540 on NH-44 under SOPD for the year 2019-20 under PWD NH Division Silchar in the State of Assam. Package No. BRD/RD/SIL(SOPD)/2019-20/18. | LOA No. BRD/RD/79/Pt/11 | 13.03.2020 | 93184649 | |
Strengthening to NH-53 (Silchar Badarpur section) from km 3.65 to km 6.25 and NH-54 at 21st km, 27th km to 30th km, 35th km and 40th km in stretches for 2019-20 on EPC mode under PWD, NH Division | LOA no. BRD/RD/45/2019/Pt/11 | 13.03.2020 | 83588761 | |
Establishment of 21 nos New Polytechnics in different district of Assam under Plan during 2011-12 at Katlicherra in Hailakandi district (Package : Poly-8) | GMC 64/2012/29 | 04.01.2014 | 79790000 | |
Construction of RCC Bridge No. 1/1 at Cheragi Bazar over River Singhala for conversion of SPT Bridges to RCC Bridges under Mahabir Lachit Chilarai Setu Nirman Abhijan of RIDF-XXV of NABARD for 2019-20 , Package No. MLCSNA/RIDF/XXV/Karimganj/04 | LOA No.CE/STBR/MLCSNA/RIDF-XXV/191/19-20/3 | 21.03.2020 | 70309675 | |
Construction of RCC Br. No. 18/2, 19/1 & 22/3 on Salchapra Bandukmara Road including approaches & Protection works for Conversion to RCC Bridges under Mahabir Lachit Chilarai Setu Nirman Abhijan under RIDF XXIV of NABARD for the year 2018-19, Package No. MLCSNA/Hailakandi/01 | CE/STBR/MLCSNA/RIDF-XXIV/59/18-19/5 | 21.02.2019 | 60436800 | |
Construction of road from (1) 05T2 to Sultanicherra Grant R.V. (ii) 05T2 to Nandagram N.C and (iii) 05T2 to Boldaboldi Punji Pt-III including CD Routine & maintenance of the Works for 5 years under PMGSY, Package No. AS-09-043 (Balance Work) | CE/PMGSY/CB/241/2009/Pt/4 | 20.12.2019 | 47684700 | |
Repair of damaged pavement by providing BM and BC at 1st km, 2nd km , 9th Km to 11th km and 41st km including providing interlocking CC Paver block at side berm , construction of road side RCC drain along with road furnitures in stretches ) under PWD NH Division, Silchar in the state of Assam, Package no. BRD/RD/SIL(SOPD)/2019-20/10 | BRD/RD/78/2019/Pt/12 | 04.03.2020 | 43336945 | |
Construction of RCC Br. No. 1/1 over river Ghagra at Merua connecting Chencoori Elgin Road with Merua under CM's Spl. Package (i) Conversion of 500 nos of wooden bridges to RCC Bridges in Cachar District under Annual Plan 2013-14 (Package No. CM's Spl./2013-14/Cch-01) | CE/STBR/CM's/Spl/62/2013-14/7 | 03.03.2014 | 39305472 | |
Construction of proposed ITI Building at Kuchila under MSDP in Hailakandi District under Silchar Building Division | BPM.42/2013/12 | 17.08.2013 | 36146800 | |
Construction of Anipur Zamung Road from Rongpur to Assam Mizoram Border under SOPD-G for the year 2018-19 under Karimganj Roral Road Division (Package No. BV/SOPD-G/2018-19/KXJ/ACE/02. | CS/ACE/BV/TECH/2018-19/19/638 | 07.02.2019 | 31099966 | |
Improvement of NH-154 fro km 0/000 (existing) to km 2/985 (existing) (Length = 2.985 km) with GSB, WMM, DBM & BC along with surface drain and ICBP in streches under SOPD for the year 2019-20 (from Ch. 0.00 km to Ch. 2/985 km) Package no. BRD/RD/KXJ(SOPD)/2019-20/15. | BRD/RD/90/2019/Pt/12 | 04.03.2020 | 25689337 | |
Construction of Road from T05 Garuncherra Punjee to Dinonathpur Pt-I including cross drainage works and routine maintenance of the works for five years under PMGSY Package No.AS-09-066. | CE/PMGSY/130/2018-19/3 | 20.02.2019 | 21722000 | |
CONSTRUCTION OF PROPOSED MODEL HIGH SCHOOL FOR TEA GARDEN AREA ,ASSAM (CATEGORY-II) (GR. NO. TG-07) | | | 20800000 | New |
Implementation of Retrofitting works in SAKALARPAR Piped Water Supply Scheme within the jurisdiction of Hailakandi Division under Jal Jeevan Mission, Assam. | LOA No. SE/PHE/HCH/TB-383/2020-2021/2735 | 23.11.2020 | 9724133 | New |
Implementation of Retrofitting works in GOUR BASTI Piped Water Supply Scheme within the jurisdiction of Hailakandi Division under Jal Jeevan Mission, Assam. | LOA No. SE/PHE/HCH/TB-383/2020-2021/2629 | 21.11.2020 | 9114000 | New |